The software handover checklist: what your team should get when a contractor leaves
When an outside team finishes building a system for you, the handover decides whether you own that system or just possess it. A good handover means your team can run it, change it and fix it without calling the people who built it. A bad one means you have code you are afraid to touch, accounts you cannot log in to, and a supplier you can never quite let go.
This is a practical checklist of what your team should receive when a contractor, agency or consultancy hands a system over, and how to check that you really have it. It applies to any software, with an extra section for AI systems, which have a few handover needs of their own.
Want it as a working checklist? The Handover Checklist is a free, tickable and printable version with a score per area, plus the questions to ask a supplier before you sign and contract wording you can adapt.
Why handovers go wrong
Most handovers fail for the same reasons, and none of them are about bad intentions.
It is left to the end. The handover is planned as the last week of the project, when the budget is nearly spent and everyone is tired. Whatever does not fit in that week is skipped.
Knowledge lives in one head. The engineer who built it knows why the nightly job runs at 02:30, which API key belongs to which account, and what to do when the queue backs up. None of that is written down, because they never needed to write it down.
Accounts are in the wrong name. The hosting account, the domain, the monitoring tool and the AI provider were opened by the contractor, on their card, under their email. Moving them later is slow, and sometimes impossible.
Nobody on your side has made a change. The documentation looks complete, but nobody has tested it by actually doing something with it. The first real test comes during an incident.
The fix for all four is the same: treat the handover as a deliverable that starts on day one, not an event at the end. Everything below is easier if it happens continuously during the project.
The handover checklist
1. Code and repositories
- All source code is in repositories owned by your organisation, not the contractor’s, ideally from the first commit.
- The full history is there, not a single “final” upload, so your team can see how and why things changed.
- Every repository has a README that explains what it is, how to run it locally, and how to run the tests.
- Your engineers have reviewed a meaningful share of the code as it was written, not only at the end.
- The contract assigns the intellectual property in the code to you, and any third-party or open-source components and their licences are listed.
2. Accounts, access and credentials
- Every account the system depends on (cloud, hosting, domain, DNS, email sending, monitoring, error tracking, AI providers, third-party APIs) is owned by your organisation and billed to you.
- You have a complete list of those accounts, what each is for and who on your side administers it.
- All secrets (API keys, passwords, certificates) are stored in a secrets manager you control, not in code, chat messages or the contractor’s password manager.
- Every credential the contractor ever had access to is rotated after the handover.
- The contractor’s access is removed everywhere, and you have checked the access lists yourself.
The last two items are where many handovers quietly fail. A contractor keeping access after the work ends is a security risk, even when everyone trusts each other. A good supplier will ask you to remove their access, not wait to be asked.
3. Infrastructure and environments
- The infrastructure is defined as code (for example Terraform, Pulumi or configuration files in the repository), so it can be understood and recreated, not only clicked together in a console.
- There is a clear list of environments (development, staging, production), what runs in each, and how they differ.
- You know where every piece runs, in which region, and what it costs per month.
- Someone on your side could rebuild a non-production environment from the repository and the documentation.
4. Deployment
- Deployments are automated through a pipeline your team controls, not run by hand from someone’s laptop.
- The pipeline runs the tests before deploying.
- There is a documented way to roll back a bad release, and someone on your side has done it at least once.
- Your team has deployed a real change to production themselves, before the contractor leaves.
5. Documentation people will actually use
Documentation fails when it is written for the people who built the system rather than the people who will run it. The useful set is short:
- An architecture overview: one diagram and a page of text showing the main parts, how data flows between them, and what the system depends on.
- Decision records: a short note for each important decision (why this database, why this provider, why this design), including the alternatives that were rejected. These answer the “why on earth is it like this?” questions that come up a year later.
- Operations notes: scheduled jobs, external dependencies, limits and quotas, and anything that needs regular attention.
- A known issues list: what does not work perfectly, what was deliberately left out, and what the contractor would do next.
That last item is a good test of a supplier’s honesty. Every system has known weaknesses. A handover that claims none is hiding them.
6. Runbooks for the failures that will happen
A runbook is a step-by-step guide for a specific situation, written so that someone who did not build the system can follow it at 3 a.m. At minimum:
- What to do when the system is down or slow.
- What to do when a dependency fails (the database, an external API, the AI provider).
- How to restore data from a backup.
- How to rotate a leaked credential.
- How to add a user, change a permission, or handle the most common support request.
7. Monitoring and alerts
- Monitoring is in place for errors, response times and availability.
- Alerts go to your team, through your channels, and the contractor has been removed from them.
- Each alert links to the runbook that explains what to do.
- Logs are retained for a defined period and your team knows how to search them.
8. Data and backups
- Backups run automatically and are stored separately from the main system.
- A restore has been tested, recently, by someone on your side. An untested backup is a hope, not a backup.
- The data model is documented, including what is personal data and how long it is kept.
- Any data the contractor copied for development or testing has been deleted, and they have confirmed it.
9. Tests
- There is an automated test suite, and it passes.
- Your team knows how to run it and what it covers, and does not cover.
- The most important business rules are tested, not only the easy parts.
10. Knowledge transfer
Documents carry facts. Confidence comes from doing. Plan for:
- Pairing sessions where your engineers make changes with the contractor alongside, then without.
- At least one real change shipped by your team alone, from code to production, before the engagement ends.
- Your team handling a real incident or support issue, with the contractor available but not leading.
- A recorded walkthrough of the system for people who join later.
Extra items for AI systems
Systems that use AI models have handover needs that ordinary software does not. Make sure you also receive:
- The prompts and model configuration, in the repository and under version control, not inside a web console.
- The evaluation set: the examples, with correct answers, used to measure whether the system is good enough, plus a way to rerun it. Without this you cannot safely change a prompt or a model. We explain why it matters in why AI pilots stall between demo and production.
- The model versions in use and a plan for when the provider retires them, which providers do regularly.
- The fallback behaviour: what the system does when the model is slow, down or returns something unusable, and how to test it.
- Cost monitoring: usage and spend per day or month, with an alert if it jumps.
- The data agreement with the AI provider: where data is processed, whether it is used for training, and how long it is kept.
The vacation test
Here is a simple way to judge any handover. Imagine the engineer who built the system goes on a three-week holiday with no phone, starting tomorrow. Now ask your team:
- Could you deploy a small change?
- Could you roll it back if it broke something?
- Could you restore yesterday’s data?
- Could you rotate a leaked API key?
- Would you know the system was down before your users told you?
- Could you explain to a new colleague why it is built the way it is?
Every “no” is a gap in the handover. Find them while the contractor is still there to close them.
What to agree before the project starts
Most handover problems are cheaper to prevent in the contract than to fix at the end:
- Code and accounts in your name from day one. Not transferred at the end; owned by you throughout.
- Handover as a defined deliverable, with the items above as acceptance criteria.
- Time for knowledge transfer in the plan and the budget, not squeezed into the last days.
- Access removal as an explicit step, with confirmation.
- A short support period after the handover, for questions that only come up once your team is running things alone.
How we approach it
Handover is the part of a project most suppliers treat as an afterthought. We named the studio after it, because we think it is the real measure of the work: not what was built, but what your team can do with it after we leave. In practice that means your repositories and accounts from the first day, your engineers reviewing code as it lands, documentation and runbooks written as we go, and our access removed at the end. More on that model in what a forward-deployed engineer is.
Frequently asked questions
What should be included in a software handover?
Ownership of the code and every account the system depends on, rotated credentials and removed contractor access, infrastructure defined as code, an automated deployment and rollback process, architecture and decision documentation, runbooks, monitoring and alerts routed to your team, tested backups, an automated test suite, and hands-on knowledge transfer. AI systems also need their prompts, evaluation set, model versions, fallback behaviour and cost monitoring.
How long should a software handover take?
If handover work happens throughout the project, the final phase can be one to three weeks, mostly pairing, a real change shipped by your team and tidying the documentation. If nothing was done until the end, expect it to take much longer and still leave gaps.
Who should own the cloud and software accounts?
Your organisation, from the start, billed to you and administered by someone on your team. Accounts opened by a contractor in their own name are one of the most common and most painful handover problems.
What is a runbook?
A step-by-step guide for handling a specific situation, such as an outage, a failed dependency, a data restore or a leaked credential, written so that someone who did not build the system can follow it under pressure.
Should a contractor keep access after the project ends?
No. Their access should be removed and every credential they could see should be rotated, even if you plan to work with them again. If you need ongoing support, grant fresh, limited access for that specific purpose.
The short version
A handover is complete when your team can deploy, roll back, restore, rotate, monitor and explain the system without the people who built it. Get the code and accounts in your name from day one, insist on runbooks and tested backups, make sure your team ships a real change before the contractor leaves, and remove their access at the end.
If you are about to bring in outside help, or are stuck with a system you are afraid to touch, start a conversation. We will tell you honestly what it would take to make it yours.